Power Electronics Engineer, Energy Storage
Redwood Materials · San Francisco, California, United States
3-5 YOE Design high-voltage (800V–1.5kVdc, 480–800Vac) and high-power (10kW–200kW) converters tailored for utility-scale BESS and industrial infrastructure.; Conduct comprehensive topology comparison and trade-off analyses…
This posting is pulled directly from Redwood Materials's own Greenhouse page and applying happens on their site, not here. Posted 2026-07-21; Skip The Boards re-checks every company's board regularly and removes listings that disappear from the source.