Substation Protection and Control Engineer, EPC
Redwood Materials · McCarran, NV
10+ YOE Nevada and South Carolina within 2 months of start date Minimum 10 years of experience in high voltage electrical design, preferably in EPC environments Advanced proficiency in:
This posting is pulled directly from Redwood Materials's own Greenhouse page and applying happens on their site, not here. Posted 2026-08-21; Skip The Boards re-checks every company's board regularly and removes listings that disappear from the source.